Installing The Monitor Cover - Siemens SONOLINE G50 Service Manual

Ultrasound systems
Hide thumbs Also See for SONOLINE G50:
Table of Contents

Advertisement

Removing and Installing the Monitor
5. Connect safety ground cable, using one M4 X 12 binding head screw and
Warning: The improper connection of the safety ground can create a shock hazard. The G50
!
and the G60 S contain hazardous voltages that can range from 90 Vac to 264 Vac. These volt-
ages can cause serious injury or death. Verify that the safety ground is attached using the cor-
rect hardware and that the installation screw is tight.
6. Connect the power cable to the system outlet.
7. As shown in Figure 4-5, route the power cable and safety ground cable
8. Verify that you do not block the screw hole for the monitor cover as you
9. Hold the receiving connector to prevent breakage, while connecting signal
10. Connect signal cable A.
11. Secure the two signal cables by tightening the screws, using the blade type
12. Route the signal cables through the larger clamp (Figure 4-5) and secure
13. Verify that the monitor turns easily without pinching any of the cables
14. Install the monitor cover as shown in Figure 4-8.
Page 8 of 52
the external tooth lock washer: Place the lock washer between the monitor
chassis and the safety ground cable lug as shown in Figure 4-5.
through the smaller clamp.
secure the smaller clamp to the speaker housing using a M4 X 12 binding
head screw with external lock washer.
cable B.
screwdriver.
the clamp to the speaker housing with a M4 X 12 binding head screw with
external lock washer.
(Figure 4-5).
Figure 4-8 Installing the Monitor Cover
7482255 Rev 01
October 2002
Siemens

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sonoline g60

Table of Contents