Performing Maintenance; Periodic Maintenance; Installing The Hematek Stain Pak - Siemens Hematek 3000 System Instruction Manual

Table of Contents

Advertisement

7

Performing maintenance

7.1

Periodic maintenance

Interval
After three Hematek Stain Paks have been used Replace pump tubing
After ten Hematek Stain Paks have been used
Table 7-1 Periodic maintenance list
7.2

Installing the Hematek Stain Pak

®
Hematek
3000 System – Instruction Manual – Version 1.3
This chapter describes how to perform maintenance and replacement work.
Periodic maintenance actions are listed in Table 7-1.
Action
Replace underplaten tubing
You will need:
• 1 new Hematek Stain Pak
WARNING
The Hematek Stain Pak contains methanol. Risk of very serious
irreversible effects through inhalation, in contact with skin, and if
swallowed
Death or serious injury can result.
• Keep the containers of the Hematek Stain Pak tightly closed.
• Wear appropriate personal protective equipment; that is, gloves,
protective clothing, safety glasses and mask.
• Pay attention to the manufacturer's information regarding the gloves'
compatibility with the materials and liquids used.
• Avoid contact with eyes and skin.
• In case of contact with eyes or skin, immediately rinse the affected area
with plenty of water for at least 15 minutes.
• In the event of an accident or if you feel unwell, seek medical advice
immediately and show the label if possible.
• Refer to the Hematek Stain Pak labeling and to Material Safety Data
Sheets for more information on first aid measures. Material Safety Data
Sheets are available from Siemens.
7 Performing maintenance
See
Chapter 7.3
Chapter 7.4
7
7
1

Advertisement

Table of Contents
loading

Table of Contents