Reinstalling The Ppcl Shielding Plate; Dimaq-Ip Power-Cable Clamp - Siemens SONOLINE G50 Service Manual

Ultrasound systems
Hide thumbs Also See for SONOLINE G50:
Table of Contents

Advertisement

Chapter 5 - Installing Equipment Options
27. At the MO drive, remove the two screws installed from the inside of the sys-
28. At the upper right corner of the host module shown in Figure 5-7, remove
!
29. Move all cables to the sides of the system to allow access to the DIMAQ-IP
Siemens
Figure 5-6 Reinstalling the PPCL Shielding Plate
tem that secure the blank panel located below the MO drive, and remove
the panel.
the screw that holds the DIMAQ-IP power-cable clamp in place.
Figure 5-7 DIMAQ-IP Power-cable Clamp
Caution: The close clearances around the DIMAQ-IP create the potential for
cable damage. Verify that no cable is pinched or abraded when the DIMAQ-IP is
removed.
installation site.
7482255 Rev 01
October 2002
Page 7 of 16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sonoline g60

Table of Contents