Installation Checklist; Contents Of This Chapter; Warnings; Checklist - ABB ACS580-01 Hardware Manual

Hide thumbs Also See for ACS580-01:
Table of Contents

Advertisement

Installation checklist

Contents of this chapter

This chapter contains an installation checklist which you must complete before you
start up the drive.

Warnings

WARNING! Obey the instructions in chapter
you ignore them, injury or death, or damage to the equipment can occur.

Checklist

Do the steps in section
the work. Go through the checklist together with another person.
Check that ...
The ambient operating conditions meet the specification in section
on page 159.
If the drive will be connected to an IT (ungrounded) system: The internal EMC filter and
the ground-to-phase varistor has been disconnected. See section
compatibility with IT (ungrounded) and corner-grounded TN systems
If the drive has not been powered (either in storage or unused) over one year: The
electrolytic DC capacitors in the DC link of the drive have been reformed. See section
Capacitors
on page 128.
There is an adequately sized protective earth (ground) conductor between the drive
and the switchboard.
Precautions before electrical work
Installation checklist 117
7
Safety instructions
on page
16
before you start
Ambient conditions
Checking the
on page 75.
on page 13. If

Advertisement

Table of Contents
loading

Table of Contents