7. Slide the cable through the hole of the lead-through plate and attach the grommet
to the hole.
8. Connect the motor cable:
If you temporarily removed the power cable grounding shelf in step 4, connect the
motor and input power cables except the 360 degree grounding, and then reinstall
the grounding shelf. Note: The screws are of different length; find out where each
of them is used in the figure at step 4. After reinstalling the grounding shelf, you
can make the 360 degree grounding for the cables.
•
Ground the shield 360 degrees by tightening the clamp of the power cable
grounding shelf onto the stripped part of the cable. (8a)
•
Connect the twisted shield of the cable to the grounding terminal. (8b)
•
Connect the phase conductors of the cable to the T1/U, T2/V and T3/W
terminals. Tighten the screws to the torque given below the figure. (8c).
R0...R2, R4
Frame size
L1, L2, L3, T1/U, T2/V, T3/W, R+, R- 0.5...0.6
PE,
7
8b
8c
8a
R0...R1
N·m
lbf·ft
1.5
R3
R2
N·m
lbf·ft
0.4
1.2...1.5
1.1
2.5...4.5
1.1
1.5
1.1
Electrical installation 83
8b
8a
R3
R4
N·m
lbf·ft
N·m
3.3
4
1.5
1.1
2.9
8c
lbf·ft
3
2.1