42 Mechanical installation

Moving the drive

Frames R5...R9: Move the transport package by pallet truck to the installation site.
Unpacking and examining delivery, frames R0...R4
The figure below shows the drive package with its contents. Examine that all items
are present and there are no signs of damage. Read the data on the type designation
label of the drive to make sure that the drive is of the correct type. See section
designation label
on page 35.
1
2
1
Drive (frame R1 shown)
2
Mounting accessories in plastic bag(s),
under the drive cover
3
Mounting template
4
Multilingual residual voltage warning
stickers
5
Multilingual quick installation and start-up
guide
8
8
5
4
3
7
8
6
6
User's manual (if ordered with a plus
code)
7
Control panel selected in the order (in a
separate package)
8
Possible options in separate packages, if
they have been ordered with a plus code,
such as for example +K457 (FCAN-01
CANopen adapter module)
Type

Advertisement

Table of Contents
loading

Table of Contents