Required Tools - ABB ACS580-01 Hardware Manual

Hide thumbs Also See for ACS580-01:
Table of Contents

Advertisement

• vertically side by side
c = 0
a
b
Check the installation site according to the requirements below:
• The installation site is sufficiently ventilated or cooled to transfer away the drive
losses. See section
• The operation conditions of the drive meet the specifications given in section
Ambient conditions
• The wall is as close to vertical as possible, of non-flammable material and strong
enough to carry the weight of the drive, see section
space requirements
• The floor/material below the installation is non-flammable.
• There is enough free space above and below the drive to enable cooling air flow,
service and maintenance, See the required free space tables for each of the
different mounting alignments on page

Required tools

To install the drive mechanically, you need the following tools:
• drill with suitable bits
• screwdriver and/or wrench with a set of suitable bits (as appropriate for the
installation hardware used)
• tape measure, if you will not be using the provided mounting template.
Frame
size
a
R0
R1
R2
R3
R4
R5
b
R6
R7
R8
R9
1)
Free space below is measured from the frame, not
from the cable box used in frames R5...R9.
Cooling data and noise
on page 159.
on page 144.
Mechanical installation 41
Vertical installation side by side -
Free space
Above (a)
Below (b)
mm
in
mm
200
7.9
200
200
7.9
200
200
7.9
200
200
7.9
200
200
7.9
200
200
7.9
200
200
7.9
300
200
7.9
300
200
7.9
300
200
7.9
300
on page 146.
Dimensions, weights and free
40
(or page 144).
1)
Between (c)
in
mm
in
7.9
0
0
7.9
0
0
7.9
0
0
7.9
0
0
7.9
0
0
11.8
0
0
11.8
0
0
11.8
0
0
11.8
0
0
11.8
0
0
3AXD00000586715.xls G

Advertisement

Table of Contents
loading

Table of Contents