Unpacking And Examining Delivery, Frames R6 - ABB ACS580-01 Hardware Manual

Hide thumbs Also See for ACS580-01:
Table of Contents

Advertisement

Unpacking and examining delivery, frames R6...R9
The figure below shows the layout of the transport package. Examine that all items
are present and there are no signs of damage. Read the data on the type designation
label of the drive to make sure that the drive is of the correct type. See section
designation label
on page 35.
4
5
2
6
1
Cable box. Power and control cable
grounding shelves in a plastic bag,
assembly drawing.
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
2
Drive with factory installed options.
3
Cardboard box
4
Straps
5
VCI bag for protecting against corrosion
6
Pallet
7
Stopper
8
Option tray
Mechanical installation 45
7
9
In the option tray
• Multilingual quick installation and start-
up guide
• User's manual (if ordered with a plus
code)
• Multilingual residual voltage warning
stickers
10 Control panel selected in the order (in a
separate package) in the option tray
11 Possible options in separate packages, if
they have been ordered with a plus code,
such as for example +K457 (FCAN-01
CANopen adapter module) in the option
tray
12 Mounting template on top of the option
tray
Type
3
8
9 10 11
12
1

Advertisement

Table of Contents
loading

Table of Contents