Site Preparation
4.6 Site Preparation
Site Preparation includes ‐
•
Obtaining any necessary legal and statutory permits for installation of radio equipment
•
Clearing physical obstructions as far as possible
•
Erecting a mast or tower if required. A mast‐sited ODU or external antenna typically
uses a pole attached to the mast.
•
Installing a pole on a building wall if required
•
Constructing a weather‐proof cabinet to house a PoE device or other IDU if it is not to
be housed indoors
•
Ensuring availability of power, typically standard local AC power
•
Ensuring that there is a LAN cable in place from the user's switch to the PoE/IDU loca‐
tion