Site Preparation
4.6 Site Preparation
Site Preparation includes ‐ 
Obtaining any necessary legal and statutory permits for installation of radio equipment 
Clearing physical obstructions as far as possible
Erecting a mast or tower if required. A mast‐sited ODU or external antenna typically 
uses a pole attached to the mast.
Installing a pole on a building wall if required
Constructing a weather‐proof cabinet to house a PoE device or other IDU if it is not to 
be housed indoors
Ensuring availability of power, typically standard local AC power
Ensuring that there is a LAN cable in place from the user's switch to the PoE/IDU loca‐
tion
4.7 Mounting Units
4.7.1 Mounting an ODU, GSU, or HSS
Use a mounting kit to mount an ODU, GSU, or HSS on a wall or pole as shown in the following 
figures:
Figure 4‐9: Mounting Kit Contents