ABB RED615 Technical Manual page 425

615 series
Hide thumbs Also See for RED615:
Table of Contents

Advertisement

1YHT530004D05 D
Table 343:
TR2PTDF Non group settings
Parameter
Values (Range)
Operation
CT connection type
Winding 1 type
Winding 2 type
Clock number
Zro A elimination
Min winding tap
Max winding tap
Tap nominal
Tapped winding
Step of tap
CT ratio Cor Wnd 1
CT ratio Cor Wnd 2
615 series
Technical Manual
Unit
1=on
5=off
1=Type 1
2=Type 2
1=Y
2=YN
3=D
4=Z
5=ZN
1=y
2=yn
3=d
4=z
5=zn
0=Clk Num 0
1=Clk Num 1
2=Clk Num 2
4=Clk Num 4
5=Clk Num 5
6=Clk Num 6
7=Clk Num 7
8=Clk Num 8
10=Clk Num 10
11=Clk Num 11
1=Not eliminated
2=Winding 1
3=Winding 2
4=Winding 1 and 2
-36...36
-36...36
-36...36
1=Not in use
2=Winding 1
3=Winding 2
0.60...9.00
%
0.40...4.00
0.40...4.00
Step
Default
1=on
1=Type 1
1=Y
1=y
0=Clk Num 0
1=Not eliminated
1
36
1
0
1
18
1=Not in use
0.01
1.50
0.01
1.00
0.01
1.00
Section 4
Protection functions
Description
Operation Off/On
CT connection type. Determined by the
directions of the connected current
transformers
Connection of the HV side windings
Connection of the LV side windings
Setting the phase shift between HV and
LV with clock number for connection
group compensation (e.g. Dyn11 -> 11)
Elimination of the zero-sequence current
The tap position number resulting the
minimum number of effective winding
turns on the side of the transformer
where the tap changer is.
The tap position number resulting the
maximum number of effective winding
turns on the side of the transformer
where the tap changer is.
The nominal position of the tap changer
resulting the default transformation ratio
of the transformer (as if there was no tap
changer)
The winding where the tap changer is
connected to
The percentage change in voltage
corresponding one step of the tap changer
CT ratio correction, winding 1
CT ratio correction, winding 2
419

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents