Chapter 4: Safety Precautions and Site Preparation

Installation Tools and Material

88
Here are the tools and material you need to provide to install the product:
Installing the chassis in an equipment rack requires the following items:
#2 Phillips-head screwdriver
Six equipment rack screws
Flat-head screwdriver
#2 Phillips-head 10 inch-lbs torque screwdriver (optional)
Installing the grounding wire requires the following items:
#2 Phillips-head screwdriver
Crimping tool
10 AWG stranded grounding wire
#2 Phillips-head 20 inch-lbs torque screwdriver (optional)
Installing the AT-SBxPWRSYS1 DC Power Supply requires the following
items:
Two 8 AWG power wires
One 10 AWG stranded grounding wire
8 mm wrench
#1 Phillips-head screwdriver
#3 Phillips-head screwdriver
#3 Phillips-head 30 to 40 inch-lbs torque screwdriver (optional)
Installing the AT-SBx31CFC960 Controller Fabric Card and Ethernet line
cards require the following items:
#2 Phillips-head screwdriver
#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)