Figure 113: Securing The Power Cord For The At-Sbxpwrsys1 Or At-Sbxpwrsys2 Ac System Power Supply To An Anchor - Allied Telesis SwitchBlade x3106 Installation Manual

Table of Contents

Advertisement

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
Figure 113. Securing the Power Cord for the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply to an Anchor
4. Connect the power cord to an appropriate AC power source to power
on the power supply.
5. If the chassis has two AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC
System Power Supplies, repeat steps 1 to 4 to power on the second
power supply.
6. After powering on the system power supplies, do one of the follow:
If the chassis has AT-SBxPWRPOE1 PoE Power Supplies,
perform the procedure in "Powering on the AT-SBxPWRPOE1 AC
PoE Power Supply" on page 176.
Otherwise, go to "Monitoring the Initialization Process" on
page 203.
Anchor
175

Advertisement

Table of Contents
loading

Table of Contents