Installing The At-Sbxpwrsys1 Or At-Sbxpwrsys2 Ac System Power Supply; Figure 50: Power Supply Slots - Allied Telesis SwitchBlade x3106 Installation Manual

Table of Contents

Advertisement

Installing the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC System
Power Supply
A
SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
For background information on the AT-SBxPWRSYS1 or AT-
SBxPWRSYS2 AC System Power Supply, refer to "Power Supplies and
Power Supply Slots" on page 24. The chassis must have at least one
system power supply.
Warning
The electronic components in the power supply can be damaged by
electro-static discharges (ESD). Follow the procedure in "Protecting
Against Electrostatic Discharge (ESD)" on page 106 to guard
against ESD damage when unpacking and installing the power
supply.
To install the AT-SBxPWRSYS1 or AT-SBxPWRSYS2 AC System Power
Supply, perform the following procedure:
1. Choose a slot in the chassis for the power supply.
You may install it in either slot C or D, shown in Figure 50. The first
system power supply should be installed in slot D, because the slot
does not come with a blank power supply panel.
PoE Power
Supply Slots
B
Caution
The AT-SBxPWRSYS1 and AT-SBxPWRSYS2 Power Supplies will
not work in slot A or B.
System Power
Supply Slots
C
Figure 50. Power Supply Slots
D
107

Advertisement

Table of Contents
loading

Table of Contents