Christie Mirage S+14K User Manual page 12

Hide thumbs Also See for Mirage S+14K:
Table of Contents

Advertisement

INSTALLATION & SETUP
Stacking Procedure
2-6
Roadster / Mirage S+ User's Manual
Downloaded From projector-manual.com Christie Manuals
STEP 4 '
Attach rigging hardware
Secure your
rigging
components to the
appropriate rigging
points—8 sliding
points are provided
on the bottom.
Tighten the nut at
each required
location (Figure
2.9) to prevent
sliding.
NOTE: 1) Use at
least 4 rigging
points for all
hoisting. 2) Use
straps, clamps or
cabling with load
capacity adequate
for the total
projector weight.
See Section 6. 3)
Do not join the
rigging straps or
cables to a
common point—
keep separated as
shown.
'
NOTES: 1) Requires stacking hardware provided standard with Roadster S
Available separately for Mirage S
+
Roadster S
position. Do not mix orientations—i.e., inverted with upright—in a stack. Secure a
maximum of 3 projectors with the stacking mounts as described below.
Figure 2.9. Using the Rigging Hardware
WARNINGS
• Maximum stack = 3 projectors.
• Stack first, then hoist.
+
. 2) Requires at least 2 people.
+
and Mirage S
projectors can be stacked in either the upright or inverted
WARNING
Do not stack more than 3 projectors.
WARNING
Christie stacking hardware required. The top
projector could slide off and cause injury or death.
WARNING
Never carry a stack.
+
only.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Roadster s+16kRoadster s+12sRoadster s+12k

Table of Contents