Bracket
2. Inspection Items
1) Inspection of Throttle Cable
1.
Check operation of throttle cable.
2.
Check throttle cable inner wire and outer wire for bend and
damage. Replace if necessary.
2) Installation of Tiller Handle
1.
Attach cables to throttle shaft
Install throttle shaft 1 with cable to Tiller handle. Be careful
2.
of location of throttle friction 2.
3.
Install bushing 3 on the steering bracket 4.
Attach Tiller handle ass'y to steering bracket 4, and tighten
4.
nut 5 to specified torque.
Arrange throttle cable as shown.
Tiller Handle Nut 5 :
6 N · m (4 lb · ft) [0.6 kgf · m]
7-10
1 as shown.
LIT
LIT
5
5
1
2
4
3
4
4st 9.9/15/20 2008