Concluding Steps - Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual

Table of Contents

Advertisement

System board and components
Figure 510: Installing the UFM board
Ê Connect the UFM board to the system board, snapping in the UFM spacer.

14.2.1.3 Concluding steps

"Installing the system air duct" on page 83
Ê
"Closing the server" on page 98
Ê
Ê When working on a rack-mounted server:
"Mounting the server in the rack" on page 115
"Connecting the server to the mains" on page 118
Ê
"Enabling SVOM boot watchdog functionality" on page 146
Ê
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task:
652
"Resuming BitLocker functionality" on page 152
Upgrade and Maintenance Manual
TX300 S8 / RX350 S8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents