Concluding Steps - Fujitsu PRIMERGY TX300 S8 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Processors
Figure 384: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).

11.3.3 Concluding steps

"Installing the system air duct" on page 83
Ê
"Closing the server" on page 98
Ê
Ê When working on a rack-mounted server:
"Mounting the server in the rack" on page 115
"Connecting the server to the mains" on page 118
Ê
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section
BIOS and iRMC" on page
"Enabling SVOM boot watchdog functionality" on page 146
Ê
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task:
506
"Updating or recovering the system board
134.
"Resuming BitLocker functionality" on page 152
Upgrade and Maintenance Manual
TX300 S8 / RX350 S8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s8

Table of Contents