Installing An M320 Fpc; Figure 91: Removing An Fpc - Juniper M320 Hardware Manual

Multiservice edge router
Hide thumbs Also See for M320:
Table of Contents

Advertisement

Copyright © 2010, Juniper Networks, Inc.

Figure 91: Removing an FPC

Installing an M320 FPC

To install an FPC (see Figure 92 on page 179 and Figure 93 on page 180):
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Place the FPC on an antistatic mat.
2.
Take each PIC to be installed in the replacement FPC out of its electrostatic bag and
3.
identify the slot on the FPC where it will be connected.
Verify that each fiber-optic PIC has a rubber safety cap covering the PIC transceiver.
4.
If it does not, cover the transceiver with a safety cap.
Install each PIC into the appropriate slot on the FPC. For information on installing a
5.
PIC, see "Installing the M320 PIC" on page 182.
Locate the slot in the FPC card cage in which you plan to install the FPC.
6.
Chapter 13: Replacing the M320 Router Hardware Components
177

Advertisement

Table of Contents
loading

Table of Contents