Packing The M320 Router For Shipment - Juniper M320 Hardware Manual

Multiservice edge router
Hide thumbs Also See for M320:
Table of Contents

Advertisement

Related
Documentation

Packing the M320 Router for Shipment

Copyright © 2010, Juniper Networks, Inc.
Appendix G: Contacting Customer Support and Returning M320 Router Hardware
Contacting Customer Support on page 281
M320 Chassis and Interface Alarm Messages on page 127
To pack the router for shipment:
Retrieve the shipping crate and packing materials in which the router was originally
1.
shipped. If you do not have these materials, contact your Juniper Networks
representative about approved packaging materials.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
2.
the strap to one of the ESD points on the chassis.
On the console or other management device connected to the master Routing Engine,
3.
enter CLI operational mode and issue the following command to shut down the router
software. (If two Routing Engines are installed, also issue the command on the backup
Routing Engine.)
user@host> request system halt
Wait until a message appears on the console confirming that the operating system
has halted.
For more information about the command, see the Junos OS System Basics and Services
Command Reference.
NOTE: The SIB might continue forwarding traffic for approximately 5
minutes after the
Shut down power to the router by pressing the power switch for all power supplies to
4.
the off (
O
) position. On both AC and DC power supplies, the switch is located on the
power supply faceplate.
Disconnect power from the router. For instructions, see "Replacing an M320 AC Power
5.
Supply Cord" on page 201 "Replacing an M320 AC Power Supply Cord" on page 201 or
"Replacing an M320 DC Power Supply Cable" on page 202.
Remove the cables that connect to all external devices. For instructions, see "Replacing
6.
the M320 Connections to Routing Engine Interface Ports" on page 142 and "Removing
an M320 PIC" on page 180.
Remove all Field Replaceable Units (FRUs) from the router.
7.
Remove the router from the rack:
8.
If you are using a mechanical lift, place the lift platform under the router, unscrew
and remove the mounting screws from the rack, and move the router to the shipping
crate.
command has been issued.
request system halt
283

Advertisement

Table of Contents
loading

Table of Contents