Sony PetaSite CSM-200B Installation Manual page 63

Consolidated storage management system
Hide thumbs Also See for PetaSite CSM-200B:
Table of Contents

Advertisement

(19) Connect the Robot cable that is drawn out in step (16) to the connector (CN302) on the CB-120
board.
(20) Fix the X cable bracket (CBL-F) and the Guide channel (EX3) to the console respectively with
the screw (PWH4 x 8).
PWH4 x 8
(21) Tighten finally the screw (PWH4 x 8) that has provisionally fixed the Guide channel (EX3) in
step (18).
(22) Install the X CABLE BRACKET (CBL-YR) with the four screws (PSW4 x 12) that are re-
moved in step (4) and the screw (PSW4 x 12) that is supplied with the equipment.
n
At this time, check that the two position-setting dowels have entered the two holes respectively.
X cable bracket
(CBL-YR)
CSM-200
CN302
CB-120 board
Guide channel (EX3)
Dowels
Y base assembly (lower)
PSW4 x 12
PSW4 x 12
4-45

Advertisement

Table of Contents
loading

Table of Contents