Avaya DEFINITY ONE Installation And Upgrades page 6

Internet protocol communications server
Hide thumbs Also See for DEFINITY ONE:
Table of Contents

Advertisement

Installation and Upgrades for DEFINITY ONE and
IP600 Internet Protocol Release 10 555-233-109
Checklists
Checklists for Installation Technicians
Installation Tasks
‰ Install the system cabinet, making sure there is
adequate ventilation.
Verify the carrier address ID on RMC
~
cabinets for most IP600 systems or CMC
cabinets for most Definity One systems.
ID: _________________
Mount the cabinets.
~
For IP600, print a 7" x 11" copy of the
IP600 Mounting Template provided on the
CD.
‰ Check electrical components.
~
Check AC power.
~
Ground power supply.
Connect uninterruptible power supply
~
(UPS).
Disconnect AC power by pulling the AC
~
power cord from the appliance inlet.
Connect cabinet and other grounds.
~
Install coupled bonding connector.
~
Connect the power cords.
~
‰ Connect the cables.
Install the processor interface cable.
~
~
Install the multiple cabinet system cables, if
needed.
‰ Install DEFINITY ONE main distribution
frame or RMC patch panels and external
modem.
December 2001
For More Information
See
''Install the Avaya IP600
system cabinet'' on page 1-11
or
''Install the DEFINITY ONE
system cabinet'' on page
See:
''Check AC power and ground
for Avaya IP600I'' on page
1-19
or
''Check AC power and ground
for DEFINITY ONE'' on page
1-64.
See:
''Cable the Avaya IP600
system'' on page 1-27
or
''Cable the DEFINITY ONE
system'' on page
1-74.
See either:
DEFINITY Communications
System Generic 1 and Generic
3 Main Distribution Field
Design (555-230-630)
or
''Install DEFINITY ONE main
distribution frame (MDF) and
external modem'' on page
1-77.
Issue 6
vi
1-56.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip600

Table of Contents