Installation and Upgrades for DEFINITY ONE and
IP600 Internet Protocol Release 10 555-233-109
Checklists
Checklists for Installation Technicians
Installation Tasks
Install the system cabinet, making sure there is
adequate ventilation.
Verify the carrier address ID on RMC
~
cabinets for most IP600 systems or CMC
cabinets for most Definity One systems.
ID: _________________
Mount the cabinets.
~
For IP600, print a 7" x 11" copy of the
IP600 Mounting Template provided on the
CD.
Check electrical components.
~
Check AC power.
~
Ground power supply.
Connect uninterruptible power supply
~
(UPS).
Disconnect AC power by pulling the AC
~
power cord from the appliance inlet.
Connect cabinet and other grounds.
~
Install coupled bonding connector.
~
Connect the power cords.
~
Connect the cables.
Install the processor interface cable.
~
~
Install the multiple cabinet system cables, if
needed.
Install DEFINITY ONE main distribution
frame or RMC patch panels and external
modem.
December 2001
For More Information
See
''Install the Avaya IP600
system cabinet'' on page 1-11
or
''Install the DEFINITY ONE
system cabinet'' on page
See:
''Check AC power and ground
for Avaya IP600I'' on page
1-19
or
''Check AC power and ground
for DEFINITY ONE'' on page
1-64.
See:
''Cable the Avaya IP600
system'' on page 1-27
or
''Cable the DEFINITY ONE
system'' on page
1-74.
See either:
DEFINITY Communications
System Generic 1 and Generic
3 Main Distribution Field
Design (555-230-630)
or
''Install DEFINITY ONE main
distribution frame (MDF) and
external modem'' on page
1-77.
Issue 6
vi
1-56.