Connect Critical Reliability Css-Connected Pn1; With 1 Switch Node - Avaya S8700 Installing

With avaya mcc1 or scc1 media gateways
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

96
Installing the Avaya™ S8700 Media Server with Avaya™ MCC1 or SCC1 Media Gateway
Duplex- or High-Reliability CSS-Connected PN1 with 1 Switch Node
Figure notes
1
2

Connect Critical Reliability CSS-Connected PN1

with 1 Switch Node

''Critical-Reliability CSS-Connected PN1 with 1 Switch Node'' on page 97
optic cabling between media gateways. The cable between port slots 1 and 2 on each switch
node is a metallic cable (H600-278).
Connect the 2 groups of 1 to 15 cables between PN1 and each of the other PNs in an alternating
port slot order: 20, 3; 19, 4; 18, 5; and so forth.
C
B
A
D
E
cadfdup KLC 031202
Media Gateway 1 (PN1 with 1 Switch Node)
Port Networks 2 through 16
C
B
A
D
E
May 2003
3
H600-278 Metallic Cable
To other port networks
4
shows typical fiber

Advertisement

Table of Contents
loading

Table of Contents