Oce CS9160 User Manual page 38

Table of Contents

Advertisement

Step 8 :
Attach the protective material (metal plate) to the head unit, and fix it with thumbscrews.
Step 9 :
Open the right maintenance cover and the front cover
Step 10 : Install the plastic bar while lifting the carriage.
Y rail
CR belt fixing
plate
Carriage fixing
shaft
Step 11 : The plastic bars are installed to both right and left side of the carriage.
Step 12 : Remove the printer from the stand. Refer to: "Installation guide"
Step 13 : Repack the printer.
Post-transport procedure
Step 1 :
To perform unpacking, assembling, and placing the printer. Please refer to: "Installation guide"
Set the printer in an available condition. Please refer to "Transferring the printer" and "Steps after
transfer".
3
1
Head unit
2
Butterfly screw
3
Head unit fastening material (metal plate)
38
User's Guide Océ CS9160 printer
2
1
Name
AP-40790 – Rev 2.0 -23/08/2011,

Advertisement

Table of Contents
loading

Table of Contents