FUEL SYSTEM
Delivery Pipe
1. Perform steps 1 to 7 of removal procedure for in
jectors. (Refer to page 4A—59.)
2. Remove the pulsation damper, pressure regula
tor, and injectors.
3. Replace the delivery pipe.
4. Install in the reverse order of removal, referring to
installation note.
Tightening torque:
Pressure regulator 8—11 N-m
(0.8—1.1 m-kg, 69—95 in-lb)
Delivery pipe
Engine hanger
Dynamic chamber
Installation note
Insulator
Install the insulators between the intake manifold and
delivery pipe.
Injector
Refer to page 4A—60.
4A
19—25 N-m
(1.9—2.6 m-kg,
14—19 ft-lb)
4 A—61