Install Display Cube Enclosures - Christie Entero RPMSP–LED01 Installation Manual

Projection engines
Hide thumbs Also See for Entero RPMSP–LED01:
Table of Contents

Advertisement

2.7

Install Display Cube Enclosures

• Tip Load! The maximum stacking limitation is 5 cubes high in a minimum 2 column display wall. The
display wall must be properly anchored anytime the wall is 2 rows or higher to prevent tipping and
provide stability. Use all the hardware provided to fasten the display cubes to the support structure.
See 2.8 Install Permanent External Support, on page 2-11.
• When stacking display cubes, they must be installed on a level surface. If the surface is not level the
stacked cubes could tip over and cause personal injury or damage to the cubes.
• Appropriate lift equipment must be used to list display cubes onto rows 2 or higher.
NOTE: A clearance of 3 ft. or more is recommended behind the display cubes for serviceability and
installation.
Before starting, check that you have all the required hardware. See
each row of cube enclosures before starting the next. Proper alignment reduces issues with image geometry and
makes sure that the wall has a seamless appearance. Once the wall is installed, it is difficult and time-
consuming to fix an alignment problem near the bottom of a wall.
1
1
1
1
2-8
Failure to comply with the following may result in death or serious injury:
2
2
3
3
2
2.3 Components and
Use to fasten side–by–side display cubes together, 
1
4 on each side panel.
Use to fasten the display cube to the pedestal or to the 
2
cube below, 2 at the back and 2 at the front.
3
For CC67/CC70/CC72 display cubes only, use to fasten
the display cube to the pedestal or cube below it, 2 on
the support bracket.
Entero Projector and Cube Installation Manual
Hardware. Complete
020-100839-01 Rev. 2 (04-2013)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents