b. For vertical adjustment: Insert 2 M8 vertical alignment screws at each end of the screen, from the
inside of the frame so that they are flush with the inside surface of the screen frame. Turn a screw
clockwise to increase the height on that side of the screen. Use vertical adjustments to equalize the
seams between the cubes.
6. For the bottom row only, adjust the screen height so that the screen touches the pedestals to prevent the
screen from shifting.
7. Repeat steps 1 to 4 to install additional screens in the row. Leave a 0.5 mm (0.019") gap between each
screen. Work from the center outwards.
8. Check and correct alignment and screen gap issues before adding a row of screens. Misalignment is
difficult to correct once all screens are in place.
9. Repeat steps 1 to 7 to install additional rows. As rows are added, adjust the screen depth adjustment screws
to make sure the screen is flat.
10. Once the second row of screens has been installed, adjust the depth screws on the first row of screens, and
tighten the long–screen bolts to lock in place.
11. Once the third row of screens has been installed, adjust the depth screws on the second row, and tighten the
long–screen bolts to lock in place.
12. Continue until all rows have been completed.
13. Tighten all screen mounting hardware to a maximum torque setting of 4.5 Nm / 39.6 lbf.in.
2-14
Screen adjustment screws
short– screen bolts
(for top row only)
Hand–tighten
long–screen bolts
before setting
screen gap
Side View
From inside screen,
raise
or
lower
screen adjustment
screws to adjust
screen gap
0.5 mm
Entero Projector and Cube Installation Manual