14. Screw the upper brackets onto the vertical supports and tighten in place. See
Figure 22. You will need the socket wrench with both extensions to tighten these
bolts.
15. Slide the chassis onto the shelf until the face plate of the chassis touches the vertical
rack support.
16. Make sure the upper brackets are installed in their correct location.
17. Screw the 14 bolts through the faceplate into the caged nuts, DO NOT TIGHTEN.
Mellanox Technologies
Figure 21: Upper Bracket Installation
Figure 22: Upper Brackets and Offset Location
Figure 23: Offset to Upper Bracket Bolts
117cm from
the shelf to
this hole.
Use the
socket
wrench with
both
extensions to
tighten these
bolts.