Figure 18: Upper Brackets And Offset Location; Figure 19: Upper Bracket Installation - Mellanox Technologies MIS5600Q-10DNC Installation Manual

648 port infiniband qdr switch platform
Hide thumbs Also See for MIS5600Q-10DNC:
Table of Contents

Advertisement

648 Port InfiniBand QDR Switch Platform User Manual
13.
Screw the upper brackets onto the vertical supports and tighten in place. You will
need the socket wrench with both extensions to tighten these bolts.
Mellanox Technologies

Figure 18: Upper Brackets and Offset Location

Figure 19: Upper Bracket Installation

This hole is 60cm up from
the top of the shelf
Rev 2.1
29