InfiniBand FDR Switch Platform Hardware User Manual
3. Screw on the shelf extension using four bolts with flat washers.
4. If you are installing the cable management system, place 14 caged nuts on the other
side of the rack in the vertical supports.
5. Unscrew both lock-down bars.
6. Place the chassis in front of the rack and as close as possible to the rack.
Mellanox Technologies
Figure 16: Place Caged Nuts
Place 8 caged nuts
between here and
here for the cable
holders
Top of shelf
Figure 17: Location for the Lock-Down Bar
With both lock-down bars removed the chassis can roll! Be very careful that the chassis
does not roll off of the pallet.
Figure 18: Fork Lift
Hinged extension
26
3
3
25
2
24
1
1
Bottom of
the chassis
Container floor
Rev 1.7
30