InfiniBand FDR Switch Platform Hardware User Manual
11. Slide the chassis onto the shelf and determine the location of the upper brackets, on
the vertical supports on the connector side of the chassis.
12. Confirm that the caged nuts for the faceplate are in the correct location.
13. Slide the chassis out just far enough to install the upper brackets. See Figure 21.
Mellanox Technologies
Figure 20: Face Plate Mounting Bolt Locations
Holes in the
faceplate for
mounting on
the rack.
The holes are
separated by
4U units.
Do not move the forklift away from the rack just yet.
Rev 1.7
32