Figure 37: Leaf Release; Figure 38: Intact Vs Defected Signal Connectors - Mellanox Technologies MSX6536-10R Hardware Installation Manual

648-port infiniband fdr switchx switch platform
Hide thumbs Also See for MSX6536-10R:
Table of Contents

Advertisement

InfiniBand FDR Switch Platform Hardware User Manual
5. Pull out the module half-way through the guiding rails using the ejector handle.
6. Lock the ejector handle.
7. Hold the body of the leaf on both sides and remove it from the chassis.
Push here to release the ejector handle
7
6
1.10.2.2 Inserting a Leaf Board
To insert the leaf board:
1. Check for foreign objects in or mechanical damage to the chassis leaf slots.
2. Check leaf mechanics for any noticeable damage.
3. Check back signal connectors' integrity. Look for any broken signal dividers or any
deviations from the pass criterion shown in Figure 38.
Mellanox Technologies
The board is short, therefore do not let go of it while sliding it out.

Figure 37: Leaf Release

9
11
8
10
When hot-swapping any of the units, it is necessary to wait 1 minute after removing
the defective part before inserting the new part. This is necessary so that the manage-
ment module will start a new cycle checking through the leafs and spines for the FW
versions.

Figure 38: Intact vs Defected Signal Connectors

Pass
Pull the ejector handle to remove the leaf
13
15
12
14
17
18
16
Fail
Rev 1.7
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msx6536-nr

Table of Contents