InfiniBand FDR Switch Platform Hardware User Manual
7. Hold the body of the board on both sides and remove it from the chassis.
1.10.5.1 Inserting a Management Module
To insert a management board:
1. Check for foreign objects in or mechanical damage to the chassis management slots.
2. Check management mechanics for any noticeable damage.
3. Check back signal connectors' integrity. Look for any broken signal dividers or any
deviations from the pass criterion shown in Figure 52.
4. Check power connector's integrity. Look for any damage on the power connector
casing or blades damage, or any deviations from the pass criterion shown in
Mellanox Technologies
The board is short, therefore do not let go of it while sliding it out.

Figure 51: Management Module

I2C
CONSOLE
MGT
When hot-swapping any of the units, it is necessary to wait 1 minute after removing
the defective part before inserting the new part. This is necessary so that the manage-
ment module will start a new cycle checking through the leafs and spines for the FW
versions.

Figure 52: Intact vs Defected Signal Connectors

Pass
RST
PSU
S.FANS
L.FANS
Master
Ejectors
MAC
Fail
Rev 1.7
55