InfiniBand FDR Switch Platform Hardware User Manual
12. Slide the chassis onto the shelf and determine the location of the upper brackets, on
the vertical supports on the connector side of the chassis.
13. Confirm that the caged nuts for the faceplate are in the correct location.
14. Slide the chassis out just far enough to install the upper brackets. See Figure 22.
Mellanox Technologies
Figure 21: Face Plate Mounting Bolt Locations
Do not move the forklift away from the rack just yet.
Figure 22: Upper Bracket Installation
Holes in the face-
plate for mount-
ing on the rack.
The holes are sep-
arated by 4U units
This hole is 60cm up from
the top of the shelf.
Use the socket wrench
with both extensions to
tighten these bolts.