InfiniBand FDR Switch Platform Hardware User Manual
7. Raise the chassis so that it is ~5cm above the shelf in the rack.
8. Raise the hinged extension on the container floor.
9. Lower the chassis until the hinged extension is sitting on the shelf extension.
10. Push the chassis from the container to the shelf.
Mellanox Technologies
Figure 19: Mechanical Lift
Save the container pallet to remove this chassis. It will be necessary for the removal
and disposal procedures.
Rev 1.7
31