Meiko M-iQ Operating Instructions Manual

Meiko M-iQ Operating Instructions Manual

Belt conveyor - dishwashing machine
Table of Contents

Advertisement

Belt conveyor - dishwashing machine
M-iQ

Operating Instructions

TRANSLATION OF THE "ORIGINAL OPERATING INSTRUCTIONS"
The original operating instructions can be downloaded from: https://partnernet.meiko.de
EN
9675717 / Valid from: 2010-01 / Update: 2017-12-07

Advertisement

Table of Contents
loading

Summary of Contents for Meiko M-iQ

  • Page 1: Operating Instructions

    Belt conveyor - dishwashing machine M-iQ Operating Instructions TRANSLATION OF THE "ORIGINAL OPERATING INSTRUCTIONS" The original operating instructions can be downloaded from: https://partnernet.meiko.de 9675717 / Valid from: 2010-01 / Update: 2017-12-07...
  • Page 2: Table Of Contents

    11.2 Pre-filter replacement 11.3 Troubleshooting / Maintenance 11.4 Maintenance 11.5 Downtime Shutting down the appliance Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 2/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 3 Regulations and Standard Values Maintenance 20.1 Basic safety measures during normal operation Maintenance manual Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 3/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 4: Introduction And General Information

    Dear Customer, We are delighted about the confidence you have shown in our products. It is very important to us that you should obtain significant use from MEIKO products and that they should make your work easier. If you follow the instructions in this document carefully, your dishwashing machine will always give you total satisfaction and will have a long service life.
  • Page 5: Name And Address Of The Manufacturer

    These information can be found on the plate in the electrical switch cabinet Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 5/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 6: Explanation Of The Safety Symbols Used

    Danger of burning: indicates possible hazard due to hot surfaces or media. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 6/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 7: General Description And Use For The Purpose Intended

    Other special dishware is described in the job confirmation. The items to be washed must be suitable for washing in dish-washing machines. If in doubt with regard to suitability, consult Meiko (about the size, version, essential suitability for warewashers ...) (info@meiko.de).
  • Page 8: Ec-Declaration Of Conformity

    Chief Technology Officer / Directeur de la technologie / Direttore tecnico / Director técnico / Technisch directeur / Teknisk direktör Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 8/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 9: Declaration Of Incorporation

    EC-richtlijnen: överensstämmelse med bestämmelserna i nedan angivna ytterligare EG-direktiv: 2014/30/EU Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 9/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 10 Chief Technology Officer / Directeur de la technologie / Direttore tecnico / Director técnico / Technisch directeur / Teknisk direktör Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 10/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 11: General Safety Instructions

    ... all the safety, warning and operating instructions provided are not removed and are legible. CAUTION! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 11/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 12: Basic Safety Measures

    The water in the wash-up area is non-potable and can´t be used for food preparation! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 12/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 13 Always keep the switch cabinets closed! Access is only allowed to qualified persons with the appropriate key / tool! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 13/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 14: Assembly Instructions (For A Partially Completed Machine)

    Assembly instructions (for a partially completed machine) These apply where the MEIKO product is a partially completed machine in the sense of the Machinery Directive (Directive 2006/42/EC). Observe the following items when connecting MEIKO products to an existing installation: The components must be aligned with one another, connected in an appropriate manner, and fastened so that safe operation is assured.
  • Page 15: Transport And Installation

    MEIKO. Check the entire installation for any damage that may have occurred during shipping. In cases of damage for the shipping, inform inmediatly to MEIKO in writing, and also send a photo of the damaged parts to MEIKO. Transport and installation...
  • Page 16 (Be careful of gratings in the floor and changes in height!) Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 16/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 17 Please also read the chapter on “General safety instructions ". Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 17/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 18: Installation And Assembly

    Special Silicon adhesive order no.: 0 870 030 order no.: 0 870 001 Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 18/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 19: Instructions For The Disposal Of The Packaging Material

    Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 19/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 20: Temperature Sensors / Temperature Limit Switches

    The temperature safety limit switch must only be exchanged after the defect has been rectified and the heating system has cooled down. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 20/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 21: Fresh Water Connection

    If valves on the appliance are also controlled by fresh water, a minimum flow pressure is necessary.See “Regulations and Standard Values” for the necessary pressures and quantities. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 21/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 22: Hot Steam, Pump Hot Water

    If, in exceptional circumstances, the condensate is to be removed in an upwards direction by pressure, this fact must be notified to MEIKO at the time of ordering. In this case the heating tubes will be modified. The modifications will include a condensate evacuator.
  • Page 23: Waste Water Connection

    In this case, do not close the steam inlet on the machine's steam shut- off valve, close the locally available shut-off valve. CAUTION! Switch off the machine to shut it down and contact the authorised MEIKO service technician in the event that small amounts of steam or water escape from the machine. CAUTION! 7.10 Waste water connection...
  • Page 24: Installation And Connection Of Dosing Units

    It is particularly important to take precautions to prevent the detergent spray from escaping when the dish-washers vertical doors are opened! As these systems are installed by chemical suppliers, Meiko can accept no liability for any damage to machines or injury to persons which might arise.
  • Page 25: Machine Settings For Initial Commissioning By The Service Engineer

    Carry out a visual check on all electrical equipment (e.g. switches, cables, housings, covers).  Carry out functional tests on all electrical switches. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 25/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 26: Washing Dishes With The Dish-Washer

     Check and ensure that all the safety equipment is operating perfectly! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 26/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 27: Operation

    Press the start button to start the dishwasher Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 27/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 28: Washing Interruption

    Press the blue button "dishwasher on" to start the dishwasher. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 28/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 29: Reverse Conveyor

    "Reverse" is TRANSPORT selection. selected. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 29/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 30 Now press The machine is now in the state: Machine off. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 30/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 31: Timer-Controlled Autofill

    If the time is OK, you can leave the dishwasher in this state. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 31/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 32 Press +/- to change the Press +/- to change the Press hour. minute. Enable using +/- Press Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 32/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 33: Date And Time

    After implementing the changes, press . This stores the new date/time. Now press Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 33/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 34: Option Greeneye

    Function: A wash ware detection switch at the feeding section of the M-iQ identifies whether or not the full belt width or merely parts of it are occupied with wash ware (tracks, highlighted by green, illuminated strips above the feeding section). The control also identifies gaps on the transport belt between tableware.
  • Page 35: Option Gio-Tech

    If the minimum level is raised above the bypass line (error 706/710 no longer present), then the GiO-Tech can be started up again. Acknowledge the error. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 35/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 36: Maintenance

    Select and confirm the desired option Following the drain "MACHINE OFF" appears on the display. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 36/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 37: Safety Instructions For Cleaning

    Remove the infeed sieve as needed. Empty the infeed sieve! Clean the infeed sieve! Insert the infeed sieve! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 37/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 38: Self Cleaning/Draining The Dishwasher

    Press dishwasher. Self-cleaning is then performed. When "Self cleaning" appears, press ..or..Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 38/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 39: W E Reserv E The Right To Change Execution And Construction

    Refill PKSP. Press The pump rinse tank is drained and refilled. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 39/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 40: W E Reserv E The Right To Change Execution And Construction

    After complete draining of the selected tank, the machine starts automatically via: Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 40/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 41: Cleaning Instructions – Daily

    NOT be sprayed with a hose or a high pressure cleaner. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 41/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 42: Care Of Stainless Steel Surfaces

    Foam can cause malfunctions in the dish-washer and a poor wash. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 42/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 43: Dosing Of The Detergent/Rinse Agent

    15 minutes. Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 43/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 44: Tips For Self-Help In The Case Of Faults

     Detergent or rinse aid product not suitable  Temperatures too low < 40°C Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 44/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 45: Staff Training

     Brass  Electrical and electronic parts  PP and other synthetic materials Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 45/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 46: Noise Level

    Max. 100 µS/cm (related to glass) Max. 80 µS/cm (related to stainless steel) (measured by conductivity). Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 46/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 47: Maintenance

    Carefully dispose of any lubricating, cooling or cleaning products that could harm the CAUTION! environment! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 47/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 48: W E Reserv E The Right To Change Execution And Construction

    These materials must be stored, shipped, collected and disposed of in suitable containers! Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 48/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 49: Maintenance Manual

    Visual inspection of deflection pulleys and adjusting rings Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 49/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 50: W E Reserv E The Right To Change Execution And Construction

    Image selected and sent to MEIKO Offenburg! ....................................Place, date: authorised technician: Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 50/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 51: W E Reserv E The Right To Change Execution And Construction

    Operating instructions dish-washing machine model M-iQ Datei:BA_B-M-iQ_9675717_EN_2010-01.docx 51/52 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstraße 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...

Table of Contents