Download Print this page

HP ProLiant DL560 Gen11 User Manual page 90

Advertisement

10. Slide the server into the rack until the chassis ears are flushed against the rack posts.
11. (Optional) Open the chassis ear latches (callout 1), and then tighten the shipping screws (callout 2).
Results
Results
The installation is complete.
Power supply options
Power supply options
Depending on the installed options and the regional location where the server was purchased, the server can be configured with one of the
supported Power supply specifications .
Subtopics
Subtopics
Hot-plug power supply calculations
Hot-plug power supply calculations
Power supply warnings and cautions
Power supply warnings and cautions
DC power supply warnings and cautions
DC power supply warnings and cautions
Power supply redundancy
Power supply redundancy
Installing an AC power supply
Installing an AC power supply
Installing a DC power supply
Installing a DC power supply
Connecting a DC power cable to a DC power source
Connecting a DC power cable to a DC power source
Hot-plug power supply calculations
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the server, see the Hewlett Packard
Enterprise Power Advisor website (https://www.hpe.com/info/poweradvisor/online
https://www.hpe.com/info/poweradvisor/online).
HPE ProLiant DL560 Gen11 Server User Guide
90

Advertisement

loading