Download Print this page

HP ProLiant DL560 Gen11 User Manual page 172

Advertisement

10. Install the OCP NIC 3.0 adapter:
a. Rotate the locking pin to the open (vertical) position (callout 1).
b. Slide the adapter into the bay until it clicks into place (callout 2).
Make sure that the adapter is seated firmly in the slot.
c. Rotate the locking pin to the close (horizontal) position (callout 3).
11. Connect the OCP bandwidth upgrade cables .
12. Install the riser cage.
13. Install the access panel .
14. Install the server into the rack .
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server .
Results
Results
The installation is complete.
Power distribution board
Power distribution board
The power distribution board (PDB) supports the installation of power supplies 3 and 4.
Subtopics
Subtopics
Installing the PDB
Installing the PDB
HPE ProLiant DL560 Gen11 Server User Guide
172

Advertisement

loading