Install the processor mezzanine tray .
16. Install the access panel .
17. Installing the server into the rack .
18. Connect all peripheral cables to the server.
19. Connect each power cord to the power source.
20. Connect each power cord to the server.
21. Power up the server .
22. If removed, install the front bezel .
Results
Results
The installation is complete.
Installing the E3.S
Installing the
E3.S drive cage
drive cage
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
T-15 Torx screwdriver
About this task
About this task
This E3.S drive cage option can be installed in Boxes 2–3.
CAUTION:
CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated with
CAUTION:
either a component or a blank.
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. If installed, open the cable management arm .
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack .
7. Place the server on a flat, level work surface.
8. Remove the access panel .
9. Do one of the following: