15. Connect the following cables:
USB 2.0 / DisplayPort Y-cable
USB 2.0 port cable
16. (Optional) Install the optical drive into the universal media bay .
17. Install the fan cage.
18. Do one of the following:
Install the air baffle .
Install the processor mezzanine tray .
19. Install the access panel .
20. Installing the server into the rack .
21. Connect all peripheral cables to the server.
22. Connect each power cord to the power source.
23. Connect each power cord to the server.
24. Power up the server .
25. If removed, install the front bezel .
Results
Results
The installation is complete.
Optical drive option
Optical drive option
The server supports a slim-type SATA optical drive.