Download Print this page

HP ProLiant DL560 Gen11 User Manual page 130

Advertisement

12. Install the riser cage.
13. Cable the type-p storage controller .
14. To enable the FBWC feature of the storage controller, install an energy pack.
15. Install the access panel .
16. Installing the server into the rack .
17. Connect all peripheral cables to the server.
18. Connect each power cord to the power source.
19. Connect each power cord to the server.
20. Power up the server .
21. Before using the controller for the first time, update the server and controller firmware if they are not the latest revision .
22. To configure the controller, see the relevant controller guide.
Results
Results
The installation is complete.
Energy pack options
Energy pack options
If there is an unplanned server power outage, the flash-backed write cache (FBWC) feature of HPE storage controllers requires a centralized
backup power source to back up the write cache data in a flash device. This server supports the following power options—collectively
known as energy pack:
HPE Smart Storage Battery
HPE Smart Storage Hybrid Capacitor
One energy pack supports multiple devices. After it is installed, the status of the energy pack appears in HPE iLO. For more information, see
the iLO user guide:
https://www.hpe.com/support/ilo6
https://www.hpe.com/support/ilo6
Subtopics
Subtopics
HPE Smart Storage Battery
HPE Smart Storage Battery
HPE ProLiant DL560 Gen11 Server User Guide
130

Advertisement

loading