4. Perform the post-installation or maintenance steps required by the procedure that necessitates the removal of the access panel.
Install the server
Install the
server into the
into the rack
Prerequisites
Prerequisites
Get help to lift and stabilize the server during rack installation. If the
might be required to help install the server
might be required to help install the
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
A fully populated server is heavy. Hewlett Packard Enterprise recommends removing the external chassis components before removing
the server from the rack.
T-25 Torx screwdriver—This tool is required if you intend to lock the shipping screws located inside the chassis ears.
Procedure
Procedure
1. Install the server into the rack:
a. Insert the inner rails into the slide rails (callout 1).
b. Slide the server into the rack until the chassis ears are flush against the rack posts (callout 2).
rack
If the server
server: : One person to support the server weight, and the other to slide the server into the rack.
server is installed higher than chest level, an additional person
is installed higher than chest level, an additional person