Horizon Fitness BOOK BINDER BQ-470 Important Information Manual page 51

Table of Contents

Advertisement

3-2
Doing the Changeover
Remove the tank unit.
(1) Insert the lifter (option) between the rails at the
bottom of the tank unit.
Check that pins on the lifter line up with
the holes on the underside of the
machine.
(2) Lift the tank unit off of the rails.
• Step on the pedal to raise the lifter.
CAUTION
Raise the tank unit 15 mm (0.59") or less.
Otherwise, the tank unit may touch the
near motors.
(3) Pull the tank unit straight out.
(4) Place the removed tank unit on the
replacement stands.
• It can be helpful to have two optional
temporary tank placement stands for this
operation.
Pin
Check that the pins on the lifter line up with
the holes on the underside of the machine.
Lift the tank unit off of the rails.
(There are two pins on the lifter.)
Lifter
Lifter Operation:
Step on the pedal,
to raise the lifter.
Pedal
The tank unit hits
here if it is raised
higher than
15 mm (0.59").
22064
51401C1
Tank Unit
Rail
Lifter
Lift the tank unit off of the
rails and pull it straight out.
22064
51401H1
22064
51401L1
41
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Book binder bq-470d

Table of Contents