Omron OMNUC R88D-WT15HF User Manual page 246

Table of Contents

Advertisement

System Design and Installation
• Connect to the case all Units inside of the case.
D Door Structure
• Construct the door of metal.
• Use a water draining structure where the door and case fit together, and leave no gaps. (Refer to the
diagrams below.)
• Use conductive packing between the door and the case, as shown in the diagrams below. Strip the
paint off of the sections of the door and case that will be in contact with the conductive packing (or mask
them during painting), so that they will be electrically conductive.
• Be careful not to let gaps be opened in the control box while tightening down screws.
Case
Control box
Door (interior view)
H Selecting Components
This section explains the criteria for selecting the connection components required for
improving noise resistance. These criteria include capacity performance, applicable
range, and so on. For more details, contact the manufacturers directly.
Door
Oil-proof packing
Oil-proof packing
Conductive packing
Conductive packing
Cross-sectional view of A–B
Chapter 3
Door
3-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents