Controller Options - HPE ProLiant DX360 Gen10 User Manual

Table of Contents

Advertisement

11. Install the card in the riser cage, and then connect any required cables, if applicable.
12. If installing a GPU requiring greater than 75 W, connect the power cable to the primary riser power connector.
13. Install the access panel (Install the access panel on page 32).
14. Install the server in the rack.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17. Power up the server (Power up the server on page 31).

Controller options

For more information on controllers, see the following information:
100
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents