9.
Route and connect the power cable.
10. Install the access panel (Install the access panel on page 32).
11. Install the server in the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server on page 31.
15. Install drives.
Installing an 8 SFF display port/USB/optical blank option
Prerequisites
Before installing this option, be sure that you have the following:
Hardware options installation
75