15. Install drives or blanks (Drive options on page 60).
16. Install the access panel (Install the access panel on page 32).
17. Install the server in the rack.
18. Power up the server on page 31.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
Primary PCI riser cage options
The primary PCI riser cage supports the following:
•
Slot 1: Full-height, 3/4-length expansion boards (up to 9.5")
•
Slot 2:
◦
Half-length, half-height expansion boards
◦
3/4-length expansion boards when either a low-profile type -a controller or no controller is installed.
Installing an optional primary PCI riser board
Prerequisites
Before installing this option, be sure you have the following:
•
The components included with the hardware option kit
•
T-15 Torx screwdriver
Procedure
1.
Back up all server data.
2.
Power down the server (Power down the server on page 31).
Hardware options installation
83