12. Install the primary PCI riser cage.
13. Install the access panel.
14. Install the server into the rack.
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server.
19. If removed, install the bezel.
The installation is complete.
Storage controller options
The server supports the following storage controllers:
•
For SATA drives only – Embedded HPE Smart Array S100i SR Gen10 Controller
•
For SAS and SATA drives:
◦
Smart Array type-a modular controller
◦
Smart Array PCIe plug-in controller
For more information on PCIe slot descriptions, see PCIe slot description on page 14.
Installing a Smart Array modular controller
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
72
Hardware options installation