HPE ProLiant DX360 Gen10 User Manual page 89

Table of Contents

Advertisement

Prerequisites
This option requires the standard primary PCI riser cage.
Before installing this option, be sure that the power supplies support the installation of this option. For more information,
see the Hewlett Packard Enterprise Configurator website (http://www.hpe.com/info/SimpleConfigurator).
In addition, be sure that you have the following items:
The components included with the hardware option kit.
HPE Gen10 CPU1 Cable Kit (if installing a high-powered GPU kit) for your server.
Procedure
1.
Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server on page 31.
4.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5.
Do one of the following:
a. Extend the server from the rack on page 31.
b. Remove the server from the rack on page 32.
6.
Remove the access panel on page 32.
7.
Remove the primary PCI riser cage (Remove the primary PCI riser cage on page 34).
8.
Install the card in the x16 slot in the primary PCI riser cage position.
9.
If installing a GPU requiring greater than 75 W, connect the power cable to the primary riser power connector.
Hardware options installation
89

Advertisement

Table of Contents
loading

Table of Contents