HPE ProLiant DX360 Gen10 User Manual page 93

Table of Contents

Advertisement

10. Install the riser cage.
11. Install one of the following, as needed:
Expansion boards (Installing an expansion board in the secondary riser cage on page 95)
GPU (Installing an accelerator or GPU in the secondary riser cage on page 98)
Controllers (Controller options on page 100)
12. Install the access panel (Install the access panel on page 32).
13. Install the server in the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server (Power up the server on page 31).
Hardware options installation
93

Advertisement

Table of Contents
loading

Table of Contents