Remove The Secondary Pci Riser Cage - HPE ProLiant DX360 Gen10 User Manual

Table of Contents

Advertisement

Remove the secondary PCI riser cage

Procedure
1.
Observe the following alert:
CAUTION: To prevent damage to the server or expansion boards, power down the server and remove all AC
power cords before removing or installing the PCI riser cage.
2.
Back up all server data.
3.
Power down the server (Power down the server on page 31).
4.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5.
Do one of the following:
a. Extend the server from the rack (Extend the server from the rack on page 31).
b. Remove the server from the rack (Remove the server from the rack on page 32).
6.
Remove the access panel (Remove the access panel on page 32).
7.
If needed, remove the primary PCI riser cage (Remove the primary PCI riser cage on page 34).
8.
Disconnect any cables connected to the PCI riser cage.
9.
Remove any expansion boards installed in the PCI riser cage.
10. Remove the PCI riser cage.
36
Operations

Advertisement

Table of Contents
loading

Table of Contents